Preferred term
B.06.04 B.06.04 Production planning
Type
Type of entity- Thsys
Broader concept
Broader conceptNarrower concepts
Narrower concepts.- Bottleneck
- Business process management
- Capacity utilization
- Crew scheduling
- Demand-side management
- Disruption management
- ERP system
- Industrial accident
- Just in time
- Lead time
- Long run and short run
- Lot size
- Master production schedule
- Production control
- Production planning
- Production planning and control system
- Production process
- Quality management
- Scheduling problem
- Simultaneous planning
- Statistical quality control
- Time scheduling
Notation
Code that uniquely identifies a concept within a concept scheme.- B.06.04
In other languages
Terms for the concept in other languages.German
URI
http://zbw.eu/stw/thsys/70029