Término preferido
B.06.04 B.06.04 Production planning
Tipo
Tipo- Thsys
Concepto genérico
Concepto genéricoConceptos específicos
Conceptos específicos- Bottleneck
- Business process management
- Capacity utilization
- Crew scheduling
- Demand-side management
- Disruption management
- ERP system
- Industrial accident
- Just in time
- Lead time
- Long run and short run
- Lot size
- Master production schedule
- Production control
- Production planning
- Production planning and control system
- Production process
- Quality management
- Scheduling problem
- Simultaneous planning
- Statistical quality control
- Time scheduling
Notation
A notation, also known as classification code, is a string of characters such as "T58.5" or "303.4833" used to uniquely identify a concept within the scope of a given concept scheme.- B.06.04
En otras lenguas
Términos para el concepto en otras lenguas.alemán
URI
http://zbw.eu/stw/thsys/70029